Crushing Copper ore in Mongolia

Copper ore crushing plant in Mongolia: jaw + cone, shipped to Tianjin at 380V 50Hz. HAMAC flow sheet and CIF quotation.

Overview

Copper ore (Mohs 4, ~120 MPa) is processed in Mongolia for aggregates, ore or industrial minerals. HAMAC configures the circuit to local conditions: Tianjin, 380V 50Hz, MNS.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Copper ore properties

Copper ore
PropertyValue
Mohs4
Compressive strength120 MPa
AbrasionMedium
Circuitjaw + cone

In Mongolia

  • Port: Tianjin.
  • Power: 380V 50Hz.
  • Standards: MNS.

Equipment

  • PE Series Jaw Crusher
  • HPT Multi-Cylinder Hydraulic Cone Crusher

Budget

Send material, capacity and product sizes for a configured FOB/CIF budget to Tianjin.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialCopper ore
Mohs hardness4
Compressive strength~120 MPa
AbrasivenessMedium
Recommended circuitjaw + cone
Destination portTianjin
Site supply380V 50Hz
Local standardsMNS
RegionAsia
Assumed dutydemolition and recycling duties
Evaluation horizonten-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectivefast mobilisation
Evaluation horizonten-year view
Site conditiona brownfield extension
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for copper ore crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  2. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  3. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  4. Sequence delivery so foundations cure while the equipment is still in manufacture.
  5. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  8. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  9. Apply jaw + cone; the reduction mechanism must suit medium abrasion and a compressive strength near 120 MPa.

For a rotating shift crew, the commissioning and training steps need more calendar time than the mechanical erection itself.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Closed-side setting range and whether automatic setting regulation is included.
  • Guaranteed power draw and the fast mobilisation trade-off it implies.
  • Liner alloy: Mn22 is a common starting point for copper ore at medium abrasion.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Dust and noise control designed to the local emission limits for Mongolia.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Local service partner, technician travel time and visa requirements for Mongolia.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages51%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts16%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.

Mistakes that cost more than the machine

  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Assuming the manufacturer's warranty covers wear parts and consumables.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  2. Record the baseline grading curve for each product fraction.
  3. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  4. Confirm the direction and tension of every belt under no load.
  5. Check lubrication levels, grease lines and oil cooler operation.
  6. Calibrate the belt scale and any level probes against a known load.
  7. Measure and log the as-new CSS / setting for future wear comparison.
  8. Dry-run the plant empty for the specified period and record vibration.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Crushing Copper ore in Mongolia: Plant, Supplier & Cost — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC supply a Copper ore plant to Mongolia?

Yes — equipment is delivered to Tianjin with MNS documentation.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.