● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Metal Ore & Mining Equipment in Chile

Metal Ore & Mining crushing and screening plants in Chile: Crushing prepares feed for grinding and beneficiation at high availability. Delivery to Valparaíso, 380V 50Hz, NCh.

Overview

Crushing prepares feed for grinding and beneficiation at high availability. In Chile the most frequently processed feed materials are Copper ore, Basalt, and equipment is normally delivered through Valparaíso on 380V 50Hz supplies.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Materials in scope

  • Iron ore — Mohs 5.5, ~160 MPa, medium abrasion
  • Copper ore — Mohs 4, ~120 MPa, medium abrasion
  • Gold ore — Mohs 4, ~110 MPa, medium abrasion
  • Manganese ore — Mohs 4, ~130 MPa, medium abrasion

Recommended machines

  • PE Series Jaw Crusher
  • HPT Multi-Cylinder Hydraulic Cone Crusher
  • Symons Cone Crusher

Engineering for Chile

Chile project parameters
ItemReference
PortValparaíso
Power380V 50Hz
StandardsNCh
RegionSouth America

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portValparaíso
Site supply380V 50Hz
Local standardsNCh
RegionSouth America
ApplicationMetal Ore & Mining
Typical feedIron ore, Copper ore, Gold ore, Manganese ore
Assumed dutycontinuous quarry production
Evaluation horizonsingle-project view

These values are the starting point for a written proposal on the crushing and screening plant; they are nominal and should be confirmed against a sample test before manufacture.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivelowest energy per tonne
Evaluation horizonsingle-project view
Site conditiona greenfield site
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  2. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  3. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  4. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  5. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  6. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  7. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  8. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  9. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Control system language, telemetry and remote diagnostics availability.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Whether the quoted t/h is achieved at continuous quarry production or under ideal laboratory feed.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Dust and noise control designed to the local emission limits for Chile.
  • Nameplate data for 380V 50Hz and the NCh certificate set.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the single-project review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Letting the continuous quarry production duty be defined verbally instead of in the contract.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.

For continuous quarry production, protect the lowest energy per tonne requirement explicitly in the contract documents.

Commissioning checklist

  1. Test emergency stops, pull wires and interlock trips in sequence.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Calibrate the belt scale and any level probes against a known load.
  4. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  5. Sample each product fraction and compare with the specification.
  6. Dry-run the plant empty for the specified period and record vibration.
  7. Hand over the spare-parts list, manuals and maintenance schedule.
  8. Measure and log the as-new CSS / setting for future wear comparison.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Metal Ore & Mining Crushing Plants in Chile — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Does HAMAC build metal ore & mining plants for Chile?

Yes — flow sheets are configured to the local feed, 380V 50Hz power and NCh requirements.

How is the crushing and screening plant sized for your target tonnage?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

What documents are needed for Chile?

Packing list, commercial invoice, bill of lading, certificate of origin and the NCh documentation applicable to the machine.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call