● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Economics

Gold ore underground mine: High energy cost per tonne — solution & design basis

KWh per saleable tonne rises while crusher output stays flat — a 150 t/h design basis, configuration and acceptance checks.

Gold ore underground mine with high energy cost per tonne is normally resolved by checking the circuit against the saleable product specification first: meter energy against saleable tonnes, not crusher feed. For a 150 t/h design point on gold ore, HAMAC would review jaw → cone / impact → screen, then confirm the settings with a written acceptance test. Start from the product specification and work backwards to the feed.

150 t/hindicative design point
60–200 MPacompressive strength
100–250 t/hscenario capacity band
370 kWorder-of-magnitude installed power
Key takeaways
  1. Gold ore is medium in abrasiveness and medium in moisture sensitivity; Quartz veins create variable hardness across the face; the plant must tolerate feed changes without re-setting every stage.
  2. For underground mine the priority is compact footprint, constrained by restricted headroom, ventilation and haulage access.
  3. High energy cost per tonne typically appears as: kWh per saleable tonne rises while crusher output stays flat.
  4. First corrective action: meter energy against saleable tonnes, not crusher feed.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for gold ore underground mine

The design basis starts with the rock, not the machine. Gold ore is rated at 60–200 MPa compressive strength with medium abrasiveness, medium moisture sensitivity and a loose bulk density around 1.80 t/m³. Quartz veins create variable hardness across the face; the plant must tolerate feed changes without re-setting every stage. Record the setting before adjusting it, or the baseline is lost.

A underground mine must fit crushing equipment into a confined excavation, constrained by restricted headroom, ventilation and haulage access. The commercial priority is compact footprint. For this combination HAMAC works from an indicative design point of 150 t/h of saleable product, with a maximum feed top size near 350 mm and target fractions of −10 mm mill feed or heap-leach agglomerate.

Gold ore — design basis (nominal values)
ParameterIndicative value / method
Raw materialGold ore · 60–200 MPa · abrasion medium
Design throughput150 t/h saleable product (100–250 t/h scenario band)
Maximum feed size~350 mm
Target product−10 mm mill feed or heap-leach agglomerate
Loose bulk density1.80 t/m³
Suggested circuitjaw → cone / impact → screen
Gold ore underground mine — Design basis for gold ore underground mine — HAMAC grinding mill
Gold ore underground mine — Design basis for gold ore underground mine — HAMAC grinding mill reference.

Why high energy cost per tonne appears in this circuit

KWh per saleable tonne rises while crusher output stays flat. In a gold ore underground mine this is usually a system symptom rather than a single machine fault. Start from the product specification and work backwards to the feed.

  • idling and recirculating material are counted as production
  • a grinding circuit is oversized for the required fineness
  • drives run at fixed speed regardless of feed rate

Indicative values are starting points for a design, not guarantees. Before changing a crusher setting, check these in order: 1) install sub-metering on the main drives; 2) calculate specific energy weekly; 3) compare idle time against loaded running hours. Confirm all figures in a written proposal before purchase.

Recommended equipment configuration

For gold ore at 150 t/h the working train is jaw → cone / impact → screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for gold ore and for a softer rock. Record the setting before adjusting it, or the baseline is lost.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~188 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~30 mm at the secondary stage
Secondary / tertiarycone / impact
ScreeningMulti-deck screen sized for 70% circulating load
ConveyingBelts sized for fresh feed + return stream, 1.80 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 370 kW order-of-magnitude connected load

The corrective actions for high energy cost per tonne are applied on top of this base circuit: meter energy against saleable tonnes, not crusher feed; match mill and classifier size to the real d97 target; add vfds to feeders and fans and interlock them with feed.

Gold ore underground mine — Recommended equipment configuration — HAMAC grinding mill
Gold ore underground mine — Recommended equipment configuration — HAMAC grinding mill reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 30 mm, a circulating load around 70% and a screen efficiency target above 90%. Indicative values are starting points for a design, not guarantees.

  • Install sub-metering on the main drives
  • Calculate specific energy weekly
  • Compare idle time against loaded running hours
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 150 t/h nominal
GradingFull sieve analysis, agreed standard, −10 mm mill feed or heap-leach agglomerate
Crusher settingCSS measured and logged, ~30 mm starting point
PowerMain-drive current at steady feed, 370 kW connected load
WearLiner mass before and after, cost per saleable tonne

Confirm all figures in a written proposal before purchase. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for gold ore, while compact footprint determines how much lost production actually costs. Start from the product specification and work backwards to the feed.

  • Ask every supplier for the same flow sheet and mass balance, including the 70% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 150 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

Record the setting before adjusting it, or the baseline is lost. Confirm all figures in a written proposal before purchase. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Gold ore underground mine — Cost, risk and what to confirm in writing — HAMAC grinding mill
Gold ore underground mine — Cost, risk and what to confirm in writing — HAMAC grinding mill reference.
FAQ

Gold ore underground mine — questions answered

Direct answers to the questions buyers ask most often.

What causes high energy cost per tonne in a gold ore underground mine?

KWh per saleable tonne rises while crusher output stays flat. The usual causes are idling and recirculating material are counted as production; a grinding circuit is oversized for the required fineness; drives run at fixed speed regardless of feed rate. meter energy against saleable tonnes, not crusher feed.

Which crusher train suits gold ore at 100–250 t/h?

A typical configuration is jaw → cone / impact → screen. Quartz veins create variable hardness across the face; the plant must tolerate feed changes without re-setting every stage. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 150 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.

WhatsApp Get a quote Call