Design basis for coal remote site
The design basis starts with the rock, not the machine. Coal is rated at 10–50 MPa compressive strength with very low abrasiveness, variable moisture sensitivity and a loose bulk density around 0.85 t/m³. Low bulk density flips the usual sizing logic: volume, dust and explosion protection dominate over crusher power. A change in one stage changes the circulating load in all the others.
A remote site must run with limited grid power and a long spares lead time, constrained by diesel generation and infrequent service visits. The commercial priority is energy and spares autonomy. For this combination HAMAC works from an indicative design point of 80 t/h of saleable product, with a maximum feed top size near 400 mm and target fractions of −50 mm and washed size fractions.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Coal · 10–50 MPa · abrasion very low |
| Design throughput | 80 t/h saleable product (60–180 t/h scenario band) |
| Maximum feed size | ~400 mm |
| Target product | −50 mm and washed size fractions |
| Loose bulk density | 0.85 t/m³ |
| Suggested circuit | sizer / impact → screen |

Why powder moisture and caking appears in this circuit
Powder cakes in the silo and the finished product moisture drifts upward. In a coal remote site this is usually a system symptom rather than a single machine fault. The answer depends on the mass balance, not on a catalogue capacity figure.
- feed surface moisture rises after rain or washing
- hot-air volume is insufficient for the evaporation load
- duct condensation forms at cold starts
Measurements are only comparable when the sieve standard is the same. Before changing a crusher setting, check these in order: 1) measure feed and product moisture each shift; 2) log mill outlet temperature; 3) inspect ducting and the bag hopper for condensation. Confirm all figures in a written proposal before purchase.
Recommended equipment configuration
For coal at 80 t/h the working train is sizer / impact → screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for coal and for a softer rock. A change in one stage changes the circulating load in all the others.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Vibrating grizzly feeder, VFD control, ~100 t/h design margin |
| Primary reduction | Jaw / impact crusher, nominal CSS ~22 mm at the secondary stage |
| Secondary / tertiary | screen |
| Screening | Multi-deck screen sized for 40% circulating load |
| Conveying | Belts sized for fresh feed + return stream, 0.85 t/m³ bulk density |
| Control | Interlocked start-up, power-based feed trim, 260 kW order-of-magnitude connected load |
The corrective actions for powder moisture and caking are applied on top of this base circuit: add or uprate the drying stage and meter inlet moisture; balance hot-air volume with feed rate and outlet temperature; pre-heat the circuit and insulate cold duct sections.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 22 mm, a circulating load around 40% and a screen efficiency target above 90%. Measurements are only comparable when the sieve standard is the same.
- Measure feed and product moisture each shift
- Log mill outlet temperature
- Inspect ducting and the bag hopper for condensation
| Parameter | Indicative value / method |
|---|---|
| Capacity | Measured over a full shift, saleable tonnes, 80 t/h nominal |
| Grading | Full sieve analysis, agreed standard, −50 mm and washed size fractions |
| Crusher setting | CSS measured and logged, ~22 mm starting point |
| Power | Main-drive current at steady feed, 260 kW connected load |
| Wear | Liner mass before and after, cost per saleable tonne |
Confirm all figures in a written proposal before purchase. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.
Cost, risk and what to confirm in writing
Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for coal, while energy and spares autonomy determines how much lost production actually costs. The answer depends on the mass balance, not on a catalogue capacity figure.
- Ask every supplier for the same flow sheet and mass balance, including the 40% return stream.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 80 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the sampling method, sieve standard and acceptance test before the order is placed.
A change in one stage changes the circulating load in all the others. Confirm all figures in a written proposal before purchase. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.