Design basis for coal greenfield plant
The design basis starts with the rock, not the machine. Coal is rated at 10–50 MPa compressive strength with very low abrasiveness, variable moisture sensitivity and a loose bulk density around 0.85 t/m³. Low bulk density flips the usual sizing logic: volume, dust and explosion protection dominate over crusher power. Operator notes from the first month are often the best diagnostic data.
A greenfield plant must fix the entire flow sheet before civil works begin, constrained by an untested feed gradation and a fixed commissioning date. The commercial priority is a verifiable mass balance. For this combination HAMAC works from an indicative design point of 210 t/h of saleable product, with a maximum feed top size near 350 mm and target fractions of −50 mm and washed size fractions.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Coal · 10–50 MPa · abrasion very low |
| Design throughput | 210 t/h saleable product (200–400 t/h scenario band) |
| Maximum feed size | ~350 mm |
| Target product | −50 mm and washed size fractions |
| Loose bulk density | 0.85 t/m³ |
| Suggested circuit | sizer / impact → screen |

Why classifier instability appears in this circuit
Coarse particles appear in the finished powder. In a coal greenfield plant this is usually a system symptom rather than a single machine fault. A supplier can only guarantee a figure when the test conditions are written down.
- rotor wear has widened the effective cut point
- feed rate exceeds the classifier separation capacity
- the return path is partially blocked
Record the setting before adjusting it, or the baseline is lost. Before changing a crusher setting, check these in order: 1) sieve the finished powder for the coarse tail; 2) record rotor current and speed; 3) inspect the return chute for build-up. A signed settings log at handover protects both parties later.
Recommended equipment configuration
For coal at 210 t/h the working train is sizer / impact → screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for coal and for a softer rock. Operator notes from the first month are often the best diagnostic data.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Vibrating grizzly feeder, VFD control, ~263 t/h design margin |
| Primary reduction | Jaw / impact crusher, nominal CSS ~34 mm at the secondary stage |
| Secondary / tertiary | screen |
| Screening | Multi-deck screen sized for 30% circulating load |
| Conveying | Belts sized for fresh feed + return stream, 0.85 t/m³ bulk density |
| Control | Interlocked start-up, power-based feed trim, 510 kW order-of-magnitude connected load |
The corrective actions for classifier instability are applied on top of this base circuit: inspect and replace worn rotor blades on a fixed interval; reduce feed until the circulating load returns to design; clean the coarse return chute and check its slope.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 34 mm, a circulating load around 30% and a screen efficiency target above 90%. Record the setting before adjusting it, or the baseline is lost.
- Sieve the finished powder for the coarse tail
- Record rotor current and speed
- Inspect the return chute for build-up
| Parameter | Indicative value / method |
|---|---|
| Capacity | Measured over a full shift, saleable tonnes, 210 t/h nominal |
| Grading | Full sieve analysis, agreed standard, −50 mm and washed size fractions |
| Crusher setting | CSS measured and logged, ~34 mm starting point |
| Power | Main-drive current at steady feed, 510 kW connected load |
| Wear | Liner mass before and after, cost per saleable tonne |
A signed settings log at handover protects both parties later. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.
Cost, risk and what to confirm in writing
Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for coal, while a verifiable mass balance determines how much lost production actually costs. A supplier can only guarantee a figure when the test conditions are written down.
- Ask every supplier for the same flow sheet and mass balance, including the 30% return stream.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 210 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the sampling method, sieve standard and acceptance test before the order is placed.
Operator notes from the first month are often the best diagnostic data. A signed settings log at handover protects both parties later. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.