Design basis for barite remote site
The design basis starts with the rock, not the machine. Barite is rated at 30–100 MPa compressive strength with low abrasiveness, low moisture sensitivity and a loose bulk density around 2.20 t/m³. High density affects conveying and classification; the target is a narrow particle-size distribution, not maximum tonnage. Indicative values are starting points for a design, not guarantees.
A remote site must run with limited grid power and a long spares lead time, constrained by diesel generation and infrequent service visits. The commercial priority is energy and spares autonomy. For this combination HAMAC works from an indicative design point of 110 t/h of saleable product, with a maximum feed top size near 550 mm and target fractions of 200–325 mesh weighting agent.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Barite · 30–100 MPa · abrasion low |
| Design throughput | 110 t/h saleable product (60–180 t/h scenario band) |
| Maximum feed size | ~550 mm |
| Target product | 200–325 mesh weighting agent |
| Loose bulk density | 2.20 t/m³ |
| Suggested circuit | jaw → impact → grinding mill → classifier |

Why bag filter pressure drop appears in this circuit
Differential pressure across the dust collector rises and the mill loses air flow. In a barite remote site this is usually a system symptom rather than a single machine fault. The answer depends on the mass balance, not on a catalogue capacity figure.
- bags are blinded by fine or damp powder
- the cleaning pulse interval or pressure is wrong
- duct leakage reduces the effective extraction volume
Record the setting before adjusting it, or the baseline is lost. Before changing a crusher setting, check these in order: 1) trend differential pressure every shift; 2) measure air volume at the mill outlet and collector; 3) inspect pulse valves and compressed-air dryness. Ask for the mass balance and the test method behind any quoted number.
Recommended equipment configuration
For barite at 110 t/h the working train is jaw → impact → grinding mill → classifier. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for barite and for a softer rock. Indicative values are starting points for a design, not guarantees.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Vibrating grizzly feeder, VFD control, ~138 t/h design margin |
| Primary reduction | Jaw / impact crusher, nominal CSS ~42 mm at the secondary stage |
| Secondary / tertiary | impact |
| Screening | Multi-deck screen sized for 70% circulating load |
| Conveying | Belts sized for fresh feed + return stream, 2.20 t/m³ bulk density |
| Control | Interlocked start-up, power-based feed trim, 270 kW order-of-magnitude connected load |
The corrective actions for bag filter pressure drop are applied on top of this base circuit: set the pulse cycle from measured differential pressure; replace blinded bags and check hopper discharge; seal the ducting and verify air volume at the mill outlet.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 42 mm, a circulating load around 70% and a screen efficiency target above 90%. Record the setting before adjusting it, or the baseline is lost.
- Trend differential pressure every shift
- Measure air volume at the mill outlet and collector
- Inspect pulse valves and compressed-air dryness
| Parameter | Indicative value / method |
|---|---|
| Capacity | Measured over a full shift, saleable tonnes, 110 t/h nominal |
| Grading | Full sieve analysis, agreed standard, 200–325 mesh weighting agent |
| Crusher setting | CSS measured and logged, ~42 mm starting point |
| Power | Main-drive current at steady feed, 270 kW connected load |
| Wear | Liner mass before and after, cost per saleable tonne |
Ask for the mass balance and the test method behind any quoted number. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.
Cost, risk and what to confirm in writing
Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for barite, while energy and spares autonomy determines how much lost production actually costs. The answer depends on the mass balance, not on a catalogue capacity figure.
- Ask every supplier for the same flow sheet and mass balance, including the 70% return stream.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 110 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the sampling method, sieve standard and acceptance test before the order is placed.
Indicative values are starting points for a design, not guarantees. Ask for the mass balance and the test method behind any quoted number. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.