Design basis for barite remote site
The design basis starts with the rock, not the machine. Barite is rated at 30–100 MPa compressive strength with low abrasiveness, low moisture sensitivity and a loose bulk density around 2.20 t/m³. High density affects conveying and classification; the target is a narrow particle-size distribution, not maximum tonnage. The reference conditions should be attached to every figure quoted.
A remote site must run with limited grid power and a long spares lead time, constrained by diesel generation and infrequent service visits. The commercial priority is energy and spares autonomy. For this combination HAMAC works from an indicative design point of 90 t/h of saleable product, with a maximum feed top size near 350 mm and target fractions of 200–325 mesh weighting agent.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Barite · 30–100 MPa · abrasion low |
| Design throughput | 90 t/h saleable product (60–180 t/h scenario band) |
| Maximum feed size | ~350 mm |
| Target product | 200–325 mesh weighting agent |
| Loose bulk density | 2.20 t/m³ |
| Suggested circuit | jaw → impact → grinding mill → classifier |

Why iron contamination and whiteness loss appears in this circuit
Brightness falls and dark specks appear in the finished filler. In a barite remote site this is usually a system symptom rather than a single machine fault. Written acceptance criteria prevent a dispute turning into a redesign.
- tramp iron passes the upstream magnet
- worn liners and grinding elements add metallic fines
- mild-steel ducting or a worn classifier rotor sheds scale
Measurements are only comparable when the sieve standard is the same. Before changing a crusher setting, check these in order: 1) measure brightness on every finished batch; 2) test the magnet with a sample piece weekly; 3) inspect liners and rotor blades at each planned stop. Confirm all figures in a written proposal before purchase.
Recommended equipment configuration
For barite at 90 t/h the working train is jaw → impact → grinding mill → classifier. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for barite and for a softer rock. The reference conditions should be attached to every figure quoted.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Vibrating grizzly feeder, VFD control, ~113 t/h design margin |
| Primary reduction | Jaw / impact crusher, nominal CSS ~26 mm at the secondary stage |
| Secondary / tertiary | impact |
| Screening | Multi-deck screen sized for 50% circulating load |
| Conveying | Belts sized for fresh feed + return stream, 2.20 t/m³ bulk density |
| Control | Interlocked start-up, power-based feed trim, 240 kW order-of-magnitude connected load |
The corrective actions for iron contamination and whiteness loss are applied on top of this base circuit: fit a magnetic separator and metal detector before the mill; select wear materials against the required brightness specification; inspect and line the conveying path for exposed steel.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 26 mm, a circulating load around 50% and a screen efficiency target above 90%. Measurements are only comparable when the sieve standard is the same.
- Measure brightness on every finished batch
- Test the magnet with a sample piece weekly
- Inspect liners and rotor blades at each planned stop
| Parameter | Indicative value / method |
|---|---|
| Capacity | Measured over a full shift, saleable tonnes, 90 t/h nominal |
| Grading | Full sieve analysis, agreed standard, 200–325 mesh weighting agent |
| Crusher setting | CSS measured and logged, ~26 mm starting point |
| Power | Main-drive current at steady feed, 240 kW connected load |
| Wear | Liner mass before and after, cost per saleable tonne |
Confirm all figures in a written proposal before purchase. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.
Cost, risk and what to confirm in writing
Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for barite, while energy and spares autonomy determines how much lost production actually costs. Written acceptance criteria prevent a dispute turning into a redesign.
- Ask every supplier for the same flow sheet and mass balance, including the 50% return stream.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 90 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the sampling method, sieve standard and acceptance test before the order is placed.
The reference conditions should be attached to every figure quoted. Confirm all figures in a written proposal before purchase. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.