Design basis for barite greenfield plant
The design basis starts with the rock, not the machine. Barite is rated at 30–100 MPa compressive strength with low abrasiveness, low moisture sensitivity and a loose bulk density around 2.20 t/m³. High density affects conveying and classification; the target is a narrow particle-size distribution, not maximum tonnage. The reference conditions should be attached to every figure quoted.
A greenfield plant must fix the entire flow sheet before civil works begin, constrained by an untested feed gradation and a fixed commissioning date. The commercial priority is a verifiable mass balance. For this combination HAMAC works from an indicative design point of 200 t/h of saleable product, with a maximum feed top size near 400 mm and target fractions of 200–325 mesh weighting agent.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Barite · 30–100 MPa · abrasion low |
| Design throughput | 200 t/h saleable product (200–400 t/h scenario band) |
| Maximum feed size | ~400 mm |
| Target product | 200–325 mesh weighting agent |
| Loose bulk density | 2.20 t/m³ |
| Suggested circuit | jaw → impact → grinding mill → classifier |

Why mill throughput below design appears in this circuit
The grinding line delivers less saleable powder than its rated t/h. In a barite greenfield plant this is usually a system symptom rather than a single machine fault. Most of these problems are diagnosed at the screen, not at the crusher.
- feed top size exceeds the mill inlet design
- roller or grinding-media wear has changed the grinding bed
- circulating load is higher than the classifier can separate
Indicative values are starting points for a design, not guarantees. Before changing a crusher setting, check these in order: 1) sieve the mill feed for top size and fines content; 2) weigh saleable powder per shift, not crusher feed; 3) log mill and classifier current at steady feed. Confirm all figures in a written proposal before purchase.
Recommended equipment configuration
For barite at 200 t/h the working train is jaw → impact → grinding mill → classifier. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for barite and for a softer rock. The reference conditions should be attached to every figure quoted.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Vibrating grizzly feeder, VFD control, ~250 t/h design margin |
| Primary reduction | Jaw / impact crusher, nominal CSS ~18 mm at the secondary stage |
| Secondary / tertiary | impact |
| Screening | Multi-deck screen sized for 20% circulating load |
| Conveying | Belts sized for fresh feed + return stream, 2.20 t/m³ bulk density |
| Control | Interlocked start-up, power-based feed trim, 490 kW order-of-magnitude connected load |
The corrective actions for mill throughput below design are applied on top of this base circuit: tighten the upstream crusher css to stabilise mill feed size; measure roller or media wear against a logged baseline; reduce feed until the circulating load returns to the design band.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 18 mm, a circulating load around 20% and a screen efficiency target above 90%. Indicative values are starting points for a design, not guarantees.
- Sieve the mill feed for top size and fines content
- Weigh saleable powder per shift, not crusher feed
- Log mill and classifier current at steady feed
| Parameter | Indicative value / method |
|---|---|
| Capacity | Measured over a full shift, saleable tonnes, 200 t/h nominal |
| Grading | Full sieve analysis, agreed standard, 200–325 mesh weighting agent |
| Crusher setting | CSS measured and logged, ~18 mm starting point |
| Power | Main-drive current at steady feed, 490 kW connected load |
| Wear | Liner mass before and after, cost per saleable tonne |
Confirm all figures in a written proposal before purchase. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.
Cost, risk and what to confirm in writing
Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for barite, while a verifiable mass balance determines how much lost production actually costs. Most of these problems are diagnosed at the screen, not at the crusher.
- Ask every supplier for the same flow sheet and mass balance, including the 20% return stream.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 200 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the sampling method, sieve standard and acceptance test before the order is placed.
The reference conditions should be attached to every figure quoted. Confirm all figures in a written proposal before purchase. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.