Design basis for LUM Ultrafine Vertical Mill grinding dolomite
The design basis starts with the powder, not the mill. Dolomite is a soft–medium mineral at Mohs 3.5 with low moisture sensitivity and specific gravity about 2.8. For a slag grinding for cement the saleable target is aggregate, agricultural lime, filler at D97 20–180 µm. Suits impact crushing and downstream grinding; lime quality depends on the grading. Record the setting before adjusting it, or the baseline is lost.
A LUM Ultrafine Vertical Mill is a sensible starting point for this duty: 3–18 t/h capacity, 400–2500 mesh (D97 3–20 µm) fineness range, premium ultrafine powder with low iron contamination. For this combination HAMAC works from an indicative design point of 10 t/h of saleable powder, with a maximum feed size near 10 mm and a target D97 of 20–180. Fineness is a distribution, not a single mesh number.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Dolomite · Mohs 3.5 · soft–medium · SG 2.8 |
| Design throughput | 10 t/h saleable powder (10–60 t/h scenario band) |
| Target fineness | D97 20–180 µm |
| Maximum feed size | ~10 mm |
| Mill type | LUM Ultrafine Vertical Mill |
| Suggested line | impact crusher → screen → optional Raymond mill |

Why classifier instability appears in this grinding circuit
Coarse particles appear in the finished powder. In a LUM Ultrafine Vertical Mill circuit on dolomite this is usually a system symptom across the mill, classifier and collector rather than a single machine fault. Two plants with the same nominal t/h can have very different operating costs.
- rotor wear has widened the effective cut point
- feed rate exceeds the classifier separation capacity
- the return path is partially blocked
Operator notes from the first month are often the best diagnostic data. Before changing a mill setting, check these in order: 1) sieve the finished powder for the coarse tail; 2) record rotor current and speed; 3) inspect the return chute for build-up. Confirm all figures in a written proposal before purchase.
Recommended grinding configuration
For dolomite at 10 t/h the working line is impact crusher → screen → optional Raymond mill. The LUM Ultrafine Vertical Mill sits at the centre; a dynamic air classifier sets the cut and a pulse-jet bag filter holds the system under negative pressure so the finished powder stays clean. Record the setting before adjusting it, or the baseline is lost.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Weigh / belt feeder, VFD control, ~12 t/h design margin |
| Milling | LUM Ultrafine Vertical Mill, 3–18 t/h, 400–2500 mesh (D97 3–20 µm) |
| Classification | Dynamic air classifier, rotor speed tuned to target D97 20–180 |
| Collection | Pulse-jet bag filter, negative pressure, ~12 m³/min air volume |
| Conveying / air | Centrifugal fan and ducting sized for 12 m³/min total air |
| Control | Interlocked start-up, load-based feed trim, ~80 kW connected load |
The corrective actions for classifier instability are applied on top of this base circuit: inspect and replace worn rotor blades on a fixed interval; reduce feed until the circulating load returns to design; clean the coarse return chute and check its slope.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after any liner, rotor or media change. For this circuit the starting point is a classifier rotor speed that holds D97 20–180, a circulating load around 35% and a collection efficiency above 99%. Operator notes from the first month are often the best diagnostic data.
- Sieve the finished powder for the coarse tail
- Record rotor current and speed
- Inspect the return chute for build-up
| Parameter | Indicative value / method |
|---|---|
| Fineness | Laser diffraction / sieve, target D97 20–180, agreed standard |
| Capacity | Weighed saleable powder per shift, 10 t/h nominal |
| Moisture | Feed and product moisture each shift |
| Power | Main drive current at steady feed, ~80 kW connected load |
| Purity | Brightness / Fe content batch check for white fillers |
Confirm all figures in a written proposal before purchase. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, mill setting and classifier efficiency.
Cost, risk and what to confirm in writing
Compare this grinding plant as cost per tonne of saleable powder, not purchase price. Energy, wear parts, media and downtime dominate the operating cost for dolomite, while energy per tonne determines how much lost production actually costs. Two plants with the same nominal t/h can have very different operating costs.
- Ask every supplier for the same flow sheet and mass balance, including the 35% return / circulating load.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 10 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the fineness test method (laser diffraction vs. sieve), sampling point and acceptance test before the order is placed.
Record the setting before adjusting it, or the baseline is lost. Confirm all figures in a written proposal before purchase. Send your material, feed size, target fineness and capacity to HAMAC Machinery for a comparable configuration and budget.