Configuration summary
50 TPH copper ore mobile crushing plant in Saudi Arabia is an indicative HAMAC Machinery engineering reference configuration for Saudi Arabia, not a record of a delivered plant. It sizes a 50 TPH line for copper ore from published equipment data; no customer name, contract value or commissioning date is claimed. Engineering reference for a 50-80 t/h copper ore mobile crushing plant in Saudi Arabia, sized for primary crushing before grinding. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
Engineering reference for a 50-80 t/h copper ore mobile crushing plant in Saudi Arabia, sized for primary crushing before grinding. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
| Parameter | Value |
|---|---|
| Raw Material | copper ore |
| Nominal Capacity | 50-80 t/h |
| Maximum Feeding Size | 425 mm |
| Output Size | 0-5, 5-10, 10-20 mm |
| Primary Crusher | PE500×750 jaw crusher |
| Secondary Crusher | PF1010 impact crusher |
| Vibrating Screen | 3YK1548, 3 decks |
| Circuit | jaw + cone in closed circuit |
| Application | primary crushing before grinding |
| Power & Layout | confirmed after site review |

Equipment configuration and process
The indicative configuration for this study is listed above. In HAMAC projects, the equipment list is fixed only after the raw material, feed gradation and saleable product fractions are confirmed — the same nominal capacity can require different crushers for basalt, limestone or river pebble.
A typical line of this size runs: vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Dust suppression, washing and a magnetic separator are added where the feed or product specification requires them.
For a 50 TPH copper ore line in Saudi Arabia, three inputs usually decide the final bill of materials: when the plant feeds a concrete or asphalt batching plant, stockpile segregation and the number of separate product bins become part of the layout; ambient temperature and altitude derate diesel engines and affect lubrication selection on the crusher and screen bearings; grid voltage and frequency, plus the available starting current for the largest motor, must be fixed before the electrical schedule is released. These are the points a HAMAC engineer checks against your own test data before the equipment list is fixed; the table above is therefore a starting specification rather than a quotation.
Compare similar plants in the project library or browse plant designs by capacity.
Delivery, installation and support
HAMAC's stated service scope covers initial consultation, solution design, site visit, production, shipment, installation supervision, commissioning, operator training, spare-parts supply and after-sales handling. For export projects the commercial scope is normally agreed as FOB, CFR or CIF, with local civil work and lifting equipment defined in the contract.
- Factory assembly and test before shipment
- Container / break-bulk loading plan with shipped spare parts and tools
- Installation drawings and commissioning supervision
- Operator training and recommended wear-parts stock list