ملخص التكوين
50 TPH copper ore mobile crushing plant in Saudi Arabia is an indicative HAMAC Machinery engineering reference configuration for Saudi Arabia, not a record of a delivered plant. It sizes a 50 TPH line for copper ore from published equipment data; no customer name, contract value or commissioning date is claimed. Engineering reference for a 50-80 t/h copper ore mobile crushing plant in Saudi Arabia, sized for primary crushing before grinding. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
Engineering reference for a 50-80 t/h copper ore mobile crushing plant in Saudi Arabia, sized for primary crushing before grinding. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
| المعلمة | القيمة |
|---|---|
| المادة الخام | خام النحاس |
| الطاقة الاسمية | 50-80 طن/ساعة |
| أقصى حجم للتغذية | 425 mm |
| حجم الناتج | 0-5، 5-10، 10-20 مم |
| الكسارة الأولية | PE500×750 كسارة الفك |
| الكسارة الثانوية | PF1010 كسارة الصدم |
| الغربال الهزاز | 3YK1548، 3 مجموعات |
| الدائرة | الفك + المخروط في دائرة مغلقة |
| التطبيق | الكسرة الأولية قبل الطحن |
| الطاقة والتصميم | تم التأكيد بعد مراجعة الموقع |

تكوين المعدات والعملية
يرد أعلاه التكوين الإرشادي لهذه الدراسة. في مشاريع HAMAC، لا يتم تحديد قائمة المعدات إلا بعد التأكد من المواد الخام وتصنيف المواد الأولية وأجزاء المنتج القابلة للبيع — فقد تتطلب السعة الاسمية نفسها استخدام كسارات مختلفة للبازلت أو الحجر الجيري أو حصى الأنهار.
يتكون الخط النموذجي من هذا الحجم من: مغذي اهتزازي → كسارة فكّية أولية → كسارة مخروطية أو صدمية ثانوية → غربال اهتزازي متعدد الطبقات → ناقلات حزامية، مع إعادة المواد ذات الحجم الزائد إلى الدائرة المغلقة. ويتم إضافة أنظمة كبح الغبار والغسل والفاصل المغناطيسي عندما تتطلب مواصفات المواد الواردة أو المنتج ذلك.
For a 50 TPH copper ore line in Saudi Arabia, three inputs usually decide the final bill of materials: when the plant feeds a concrete or asphalt batching plant, stockpile segregation and the number of separate product bins become part of the layout; ambient temperature and altitude derate diesel engines and affect lubrication selection on the crusher and screen bearings; grid voltage and frequency, plus the available starting current for the largest motor, must be fixed before the electrical schedule is released. These are the points a HAMAC engineer checks against your own test data before the equipment list is fixed; the table above is therefore a starting specification rather than a quotation.
Compare similar plants in the project library or browse plant designs by capacity.
التسليم والتركيب والدعم
يشمل نطاق الخدمة المعلن عن HAMAC الاستشارة الأولية، وتصميم الحلول، وزيارة الموقع، والإنتاج، والشحن، والإشراف على التركيب، والتشغيل التجريبي، وتدريب المشغلين، وتوريد قطع الغيار، وخدمات ما بعد البيع. وبالنسبة لمشاريع التصدير، يتم الاتفاق عادةً على النطاق التجاري وفقًا لشروط FOB أو CFR أو CIF، مع تحديد الأعمال المدنية ومعدات الرفع المحلية في العقد.
- التجميع والاختبار في المصنع قبل الشحن
- خطة التحميل في حاويات / شحن جزئي مع قطع الغيار والأدوات المرسلة
- رسومات التركيب والإشراف على التشغيل التجريبي
- تدريب المشغلين وقائمة قطع التآكل الموصى بتخزينها