Short answer
Cost per tonne is the total of energy, wear parts, labour and downtime divided by saleable tonnes produced; it is the only figure that lets two different crushers be compared honestly. This is particularly relevant where feed varies between benches. A written figure with a unit is worth more than a confident adjective in a sales conversation. The four cost lines that decide whether a low purchase price was actually cheap. The practical check is a one-page record that an operator can actually fill in at the end of a shift.
- Cost per tonne and wear-part economics is decided by measurable site inputs, not by a catalogue maximum.
- Check 4 lines and Saleable tonnes before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
The same logic applies one stage further down the line. A cheap liner that wears 30% faster can cost more once change-out downtime is counted The useful unit is per saleable tonne, which automatically accounts for rejected fines.

What is changing on site
Three shifts are shaping how operating crushing and grinding plants are specified where feed varies between benches: Recirculating load silently multiplies both energy and wear; Fines rejected by the market should not be counted as production; and Holding a spare liner set is cheaper than air-freighting one. Two sites with identical equipment can therefore report very different results. Recirculating load silently multiplies both energy and wear
- Recirculating load silently multiplies both energy and wear
- A cheap liner that wears 30% faster can cost more once change-out downtime is counted
- Holding a spare liner set is cheaper than air-freighting one
cost per tonne, saleable tonnes, liner consumption are the terms that should appear in the technical schedule of any offer. A proposal that omits them is asking the buyer to carry the risk.
What the numbers say
| Figure | What it means |
|---|---|
| 4 lines | energy, wear parts, labour, downtime |
| Saleable tonnes | the correct denominator, not feed tonnes |
| Downtime | usually the largest hidden cost on remote sites |
| Silica content | the main driver of liner consumption |
Read these figures as a set. energy, wear parts, labour, downtime matters only alongside the correct denominator, not feed tonnes. Ask for the assumption behind any figure you are expected to sign off. The same logic applies one stage further down the line. Record liner mass and hours at every change

Key facts for citation
| Figure | What it means |
|---|---|
| 4 lines | energy, wear parts, labour, downtime |
| Saleable tonnes | the correct denominator, not feed tonnes |
| Downtime | usually the largest hidden cost on remote sites |
| Silica content | the main driver of liner consumption |
Entity: HAMAC Machinery. Subject: Cost per tonne and wear-part economics. Equipment class: operating crushing and grinding plants. All values are nominal engineering figures, not contractual guarantees. Ask for the assumption behind any figure you are expected to sign off.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For operating crushing and grinding plants that means the cost per tonne is fixed only after the material test and the saleable fractions are agreed, where feed varies between benches.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. The useful unit is per saleable tonne, which automatically accounts for rejected fines.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
Purchase price is paid once; cost per tonne is paid every day the plant runs.— HAMAC Machinery, technical note on cost per tonne and wear-part economics