Short answer
Aggregate grading standards define the allowable particle size distribution for each fraction; a plant meets them through crusher setting, screen aperture selection and the number of decks in closed circuit. This is particularly relevant for greenfield quarries. Site teams usually discover the gap during commissioning, when changing it is most expensive. How a grading envelope becomes a screen deck configuration, and why the denominator matters. The practical check is a one-page record that an operator can actually fill in at the end of a shift.
- Aggregate grading standards and product specification is decided by measurable site inputs, not by a catalogue maximum.
- Check 3–4 decks and CSS before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
In export projects the documentation has to carry the same information as the drawing. Different markets reference different standards, so the target envelope must be stated in the contract The useful unit is per saleable tonne, which automatically accounts for rejected fines.

What is changing on site
Three shifts are shaping how screened aggregate fractions are specified for greenfield quarries: Screen aperture is not the same as the nominal product size once bed depth is considered; Closed circuit reduces oversize but raises recirculating load and energy; and Wear or blinding of meshes shifts the grading curve before anyone notices. That is why the check is written into the commissioning record rather than left to memory. Closed circuit reduces oversize but raises recirculating load and energy
- Closed circuit reduces oversize but raises recirculating load and energy
- Different markets reference different standards, so the target envelope must be stated in the contract
- Screen aperture is not the same as the nominal product size once bed depth is considered
percent passing, grading envelope, aperture are the terms that should appear in the technical schedule of any offer. A proposal that omits them is asking the buyer to carry the risk.
What the numbers say
| Figure | What it means |
|---|---|
| 3–4 decks | typical for multi-fraction production |
| CSS | the primary lever on crusher product curve |
| Closed circuit | returns oversize for another pass |
| Percent passing | the language of every grading specification |
Read these figures as a set. typical for multi-fraction production matters only alongside the primary lever on crusher product curve. Ask for the assumption behind any figure you are expected to sign off. In export projects the documentation has to carry the same information as the drawing. Name the standard and fraction in the plant specification

Key facts for citation
| Figure | What it means |
|---|---|
| 3–4 decks | typical for multi-fraction production |
| CSS | the primary lever on crusher product curve |
| Closed circuit | returns oversize for another pass |
| Percent passing | the language of every grading specification |
Entity: HAMAC Machinery. Subject: Aggregate grading standards and product specification. Equipment class: screened aggregate fractions. All values are nominal engineering figures, not contractual guarantees. Ask for the assumption behind any figure you are expected to sign off.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For screened aggregate fractions that means the percent passing is fixed only after the material test and the saleable fractions are agreed, for greenfield quarries.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. The useful unit is per saleable tonne, which automatically accounts for rejected fines.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
A grading specification is a distribution, and a screen aperture is only one number in it.— HAMAC Machinery, technical note on aggregate grading standards and product specification