Technical long-tail guide

PE Series Jaw Crusher Applications

Where a PE Series Jaw Crusher is used: materials it handles, industries it serves and typical plant configurations across aggregates, mining and recycling.

Overview

The PE Series Jaw Crusher is applied across aggregates, mining, beneficiation and recycling. The material properties decide whether it is the right machine.

Overview — HAMAC jaw crusher reference
Overview — HAMAC jaw crusher reference.

Materials it handles

  • Hard rock: granite, basalt, andesite, gabbro.
  • Soft rock: limestone, marble, dolomite.
  • Ores: iron, copper, gold, manganese.
  • Recycling: concrete, asphalt, C&D waste.

Industries

  • Quarrying and construction aggregates.
  • Metal ore crushing and beneficiation.
  • Manufactured sand and road base.
  • Cement raw meal and industrial minerals.

Typical configuration

Usually combined with a feeder, screen and conveyors into a complete circuit, or as a module in a mobile plant.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine linePE Series Jaw Crusher
CategoryJaw Crusher
Assumed dutycement raw-meal preparation
Evaluation horizonten-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Published PE Series Jaw Crusher model data

PE Series Jaw Crusher — nominal published data
ModelInput SizeMax Feeding SizeOutput RangeCapacityEngine PowerWeight
PEX250x750250x750 mm210 mm25-60 mm13-35 T/H30 KW5.5 T
PEX250x1000250x1000 mm210 mm25-60 mm16-52 T/H37 KW7 T
PEX250x1200250x1200 mm210 mm25-60 mm20-61 T/H55 KW9.5 T
PEX300x1300300x1300 mm250 mm20-90 mm16-105 T/H75 KW15.6 T
PE400×600400×600 mm340 mm40-100 mm16-60 T/H30 KW6.7 T
PE500×750500×750 mm425 mm50-100 mm40-110 T/H55 KW11.7 T
PE600×900600×900 mm500 mm65-180 mm80-180 T/H55-75 KW16.1 T
PE750×1060750×1060 mm630 mm80-180 mm110-320 T/H90-110 KW30.1 T

Jaw crushers are often used for primary crushing in mine material crushing. Read the table column by column against cement raw-meal preparation: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a brownfield extension in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycement raw-meal preparation
Primary objectivemaximum mechanical availability
Evaluation horizonten-year view
Site conditiona brownfield extension
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for pe series jaw crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  2. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  3. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  4. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  5. Book shipping, prepare the packing list and confirm the container loading plan.
  6. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  7. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  8. Sequence delivery so foundations cure while the equipment is still in manufacture.
  9. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC jaw crusher reference
From enquiry to the first saleable tonne — HAMAC jaw crusher reference.

What to verify before you sign

  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Liner alloy: Mn18 with ceramic inserts matched to the rock, not to the lowest purchase price.
  • Guaranteed power draw and the maximum mechanical availability trade-off it implies.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Whether the quoted t/h is achieved at cement raw-meal preparation or under ideal laboratory feed.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Dust and noise control designed to the local emission limits for your market.

Ask each supplier to price the same list. Quotations for pe series jaw crusher only become comparable when the scope is identical.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

A ten-year view normally reverses the ranking of two otherwise similar offers once wear and energy are included.

Mistakes that cost more than the machine

  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Omitting a bypass chute, so a single screen fault stops the whole line.

Review the list with an owner-operator team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Dry-run the plant empty for the specified period and record vibration.
  2. Test emergency stops, pull wires and interlock trips in sequence.
  3. Verify rotation direction on every motor before coupling.
  4. Record power draw, tonnage and chamber pressure at steady state.
  5. Check lubrication levels, grease lines and oil cooler operation.
  6. Record the baseline grading curve for each product fraction.
  7. Measure and log the as-new CSS / setting for future wear comparison.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

On a brownfield extension, allow extra time for the dust and noise measurements.

PE Series Jaw Crusher Applications & Suitable Materials — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can a PE Series Jaw Crusher produce manufactured sand?

For sand, a VSI is the shaping stage after the PE Series Jaw Crusher; the two are often paired in a complete line.

Is it suitable for recycling?

With a magnet and proper feed control, yes — especially impact-based units for concrete and asphalt.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Do you build plants for cement raw-meal preparation?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call