Spiral (Screw) Sand Washer Installation Steps

Spiral (Screw) Sand Washer Installation Steps. HAMAC practical guidance with checklists and FAQ for plant buyers and operators.

Overview

Practical, numbers-first guidance on the Spiral (Screw) Sand Washer — written for engineers specifying, buying and running crushing plants.

Overview — HAMAC VSI sand making machine reference
Overview — HAMAC VSI sand making machine reference.

Preparation

  • Confirm foundation per HAMAC layout.
  • Check power and cable routing.
  • Lift and level on grout.

Commissioning

  • Dry run, then graded load.
  • Set CSS and verify product.
  • Train operators.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineSpiral (Screw) Sand Washer
CategorySand Making & Washing
Assumed dutyseasonal road-project supply
Evaluation horizonfive-year view

Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and five-year operating plan.

Published Spiral (Screw) Sand Washer model data

Spiral (Screw) Sand Washer — nominal published data
ModelScrew diameter (mm)Sink length (mm)Feeding size (mm)Capacity (t/h)Power (kW)
XL5155157615≤105–155.5
XL7657657620≤1020–6011
XL9209207585≤1040–11011
2XL9209207585≤1080–2202×11
XL112011209750≤1050–13018.5
2XL112011209750≤10100–2602×18.5

XL / 2XL screw sand washers, 5–260 t/h, remove clay and fines from manufactured sand with low water consumption. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a remote mine site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivetight grading compliance
Evaluation horizonfive-year view
Site conditiona remote mine site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for spiral (screw) sand washer may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  2. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  3. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  4. Book shipping, prepare the packing list and confirm the container loading plan.
  5. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  6. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  7. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  8. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  9. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.

Shortening this sequence is possible on a remote mine site, but only where the feed and product specification are already fully defined.

From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference
From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference.

What to verify before you sign

  • Guaranteed power draw and the tight grading compliance trade-off it implies.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Whether the quoted t/h is achieved at seasonal road-project supply or under ideal laboratory feed.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Availability of a full-time plant team for liner changes and the lifting equipment on site.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • After-sales response time, technician availability and the warranty exclusions in writing.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the five-year review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

On seasonal road-project supply, the tight grading compliance objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Buying tight grading compliance on price alone and losing it in availability.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Letting the seasonal road-project supply duty be defined verbally instead of in the contract.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.

For seasonal road-project supply, protect the tight grading compliance requirement explicitly in the contract documents.

Commissioning checklist

  1. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  2. Dry-run the plant empty for the specified period and record vibration.
  3. Measure and log the as-new CSS / setting for future wear comparison.
  4. Check lubrication levels, grease lines and oil cooler operation.
  5. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  6. Record power draw, tonnage and chamber pressure at steady state.
  7. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  8. Confirm the direction and tension of every belt under no load.

For a full-time plant team, run through this list twice — once with the supervisor and once without.

Spiral (Screw) Sand Washer Installation Steps — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Where do I get Spiral (Screw) Sand Washer support?

HAMAC provides installation supervision, training and a 24-hour technical response target.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.