● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Concrete & Asphalt Recycling Crusher in Ukraine

Concrete & Asphalt Recycling Crusher in Ukraine — HAMAC equipment, delivery to Odessa, 380V 50Hz power and DSTU documentation. Request a configured quotation.

Overview

Mobile impact plants recover rebar-free aggregate from demolition concrete and RAP asphalt directly on site in Ukraine, cutting haulage and landfill cost.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Scope of supply

  • Tracked or wheel impact crusher with a magnet.
  • Grizzly / scalping screen to remove fines and soil.
  • Air separation for light contaminants.
  • Closed-loop water where washing is required.
  • Product certification to local DSTU grading.

Market parameters for Ukraine

Ukraine reference data
ItemReference
RegionEurope
PortOdessa
Voltage / frequency380V 50Hz
StandardsDSTU
Typical feedGranite, Iron ore

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialConcrete & asphalt
Mohs hardness3
Compressive strength~50 MPa
AbrasivenessLow
Recommended circuitmobile impact + screen
Destination portOdessa
Site supply380V 50Hz
Local standardsDSTU
RegionEurope
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonten-year view

At high-tonnage aggregate supply, the ranking of these parameters changes: simple operator maintenance usually becomes the deciding constraint rather than the headline tonnage.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivesimple operator maintenance
Evaluation horizonten-year view
Site conditiona remote mine site
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for concrete & asphalt crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  2. Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
  3. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  4. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  5. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  6. Apply mobile impact + screen; the reduction mechanism must suit low abrasion and a compressive strength near 50 MPa.
  7. Survey the feed: Concrete & asphalt (Mohs 3, ~50 MPa, low abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
  8. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  9. Sequence delivery so foundations cure while the equipment is still in manufacture.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

What to verify before you sign

  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Dust and noise control designed to the local emission limits for Ukraine.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Availability of a small contractor crew for liner changes and the lifting equipment on site.
  • Liner alloy: Mn22 is a common starting point for concrete & asphalt at low abrasion.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.

Share this list with a small contractor crew as well as procurement; operators are the ones who live with the omissions.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts13%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a low-abrasion feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Letting the high-tonnage aggregate supply duty be defined verbally instead of in the contract.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a remote mine site.

Review the list with a small contractor crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Check lubrication levels, grease lines and oil cooler operation.
  2. Measure noise and dust at the operator position against the local limit.
  3. Sample each product fraction and compare with the specification.
  4. Calibrate the belt scale and any level probes against a known load.
  5. Dry-run the plant empty for the specified period and record vibration.
  6. Measure and log the as-new CSS / setting for future wear comparison.
  7. Record power draw, tonnage and chamber pressure at steady state.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Concrete & Asphalt Recycling Crusher in Ukraine — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

How fast can HAMAC quote for Ukraine?

A flow sheet and budget are normally returned within 24 hours of receiving material, feed size and target capacity.

Is installation support available in Ukraine?

Yes — supervision, commissioning and operator training are part of the standard export scope.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Do you build plants for high-tonnage aggregate supply?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

What documents are needed for Ukraine?

Packing list, commercial invoice, bill of lading, certificate of origin and the DSTU documentation applicable to the machine.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call