Overview
HAMAC supplies crushing and grinding equipment to Iran, shipped to Bandar Abbas and quoted to local standards (ISIRI). Power is configured for 380V 50Hz.

Crushing equipment for Iran
- Popular material: Copper ore, Limestone.
- Destination port: Bandar Abbas.
- Voltage / frequency: 380V 50Hz.
- Standards: ISIRI.
What HAMAC provides
- Plant design for copper ore and your capacity.
- Equipment configured to 380V 50Hz and ISIRI.
- FOB / CFR / CIF quotation to Bandar Abbas.
- Installation supervision, training and spare parts.
Logistics & documentation
HAMAC handles packing, container loading plan and the documentation required for Iran, including certificates applicable to your market.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Destination port | Bandar Abbas |
| Site supply | 380V 50Hz |
| Local standards | ISIRI |
| Region | Middle East |
| Assumed duty | continuous quarry production |
| Evaluation horizon | five-year view |
Treat this as a living sheet. Every revision of the flow sheet for Iran should update the same fields so the equipment list stays traceable.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | continuous quarry production |
| Primary objective | lowest energy per tonne |
| Evaluation horizon | five-year view |
| Site condition | a coastal export terminal |
| Operating team | a rotating shift crew |
Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Check bearing and lubrication arrangements against the ambient temperature range at the site.
- Book container or flat-rack space to Bandar Abbas and prepare the customs document set in advance.
- Confirm the haul-road and stockpile plan with a coastal export terminal in mind before fixing conveyor lengths.
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
- Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Specify motors, starters and documentation for 380V 50Hz and ISIRI before manufacture.
- Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

What to verify before you sign
- Nameplate data for 380V 50Hz and the ISIRI certificate set.
- Closed-side setting range and whether automatic setting regulation is included.
- Local service partner, technician travel time and visa requirements for Iran.
- Erection scope: supervision only, or full civil, mechanical and electrical installation.
- Availability of a rotating shift crew for liner changes and the lifting equipment on site.
- Liner alloy: Mn22 matched to the rock, not to the lowest purchase price.
- Written performance guarantee, sampling method and acceptance-test protocol.
- Product sampling points and the lab equipment needed for routine grading checks.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
For the crushing and screening plant at your target tonnage, wear parts and energy usually outweigh the difference between two purchase prices within three to five years.
Mistakes that cost more than the machine
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
- Letting the continuous quarry production duty be defined verbally instead of in the contract.
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a coastal export terminal.
- Ordering no spares with the plant and waiting six weeks for the first liner set.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
- Using one liner profile for both secondary and tertiary stages.
On a coastal export terminal, the civil and logistics items deserve as much attention as the crusher itself.
Commissioning checklist
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
- Test emergency stops, pull wires and interlock trips in sequence.
- Confirm all guards, emergency stops and pull-wire switches function.
- Introduce feed in graded steps: 25%, 50%, 75%, then full load.
- Record the baseline grading curve for each product fraction.
- Dry-run the plant empty for the specified period and record vibration.
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
- Measure noise and dust at the operator position against the local limit.
For a rotating shift crew, run through this list twice — once with the supervisor and once without.