● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

VSI Vertical Shaft Impact Crusher (Sand Making Machine) for Canada

VSI Vertical Shaft Impact Crusher (Sand Making Machine) supplied to Canada: published model data, 575V 60Hz motors, CSA documentation and delivery to Vancouver. HAMAC factory quotation.

Overview

This page brings together the published VSI Vertical Shaft Impact Crusher (Sand Making Machine) model data and the practical details of importing it into Canada — power supply, standards, shipping and commissioning. Popular feed materials in the market include Granite, Aggregates.

Overview — HAMAC impact crusher reference
Overview — HAMAC impact crusher reference.

Published VSI Vertical Shaft Impact Crusher (Sand Making Machine) data

VSI Vertical Shaft Impact Crusher (Sand Making Machine) nominal technical data
Published parameterNominal value
VSI7611≤35 60–90
VSI7615≤35 70–140
VSI8518≤40 100–130
VSI8522≤40 120–160
VSI9526≤45 150–190
VSI9532≤45 180–220

Local conditions in Canada

  • Destination port: Vancouver.
  • Site supply: 575V 60Hz.
  • Standards: CSA.
  • Common materials: Granite, Aggregates.
  • Region: North America.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Vancouver, sets motors and starters to 575V 60Hz, and supplies the certificate set applicable to CSA. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portVancouver
Site supply575V 60Hz
Local standardsCSA
RegionNorth America
Machine lineVSI Vertical Shaft Impact Crusher (Sand Making Machine)
CategorySand Making & Washing
Assumed dutymine pre-beneficiation feed
Evaluation horizonthree-year view

These values are the starting point for a written proposal on vsi vertical shaft impact crusher (sand making machine); they are nominal and should be confirmed against a sample test before manufacture.

Published VSI Vertical Shaft Impact Crusher (Sand Making Machine) model data

VSI Vertical Shaft Impact Crusher (Sand Making Machine) — nominal published data
ModelMax. feeding size (mm)Nominal through capacity (t/h)Motor power (kW)
VSI7611≤3560–9055×2
VSI7615≤3570–14075×2
VSI8518≤40100–13090×2
VSI8522≤40120–160110×2
VSI9526≤45150–190132×2
VSI9532≤45180–220160×2
VSI1140≤50225–260200×2
VSI1145≤50250–300220×2

VSI sand making machine, 60–500 t/h, for manufactured sand and aggregate shaping with rock-on-rock crushing and interchangeable wear parts. Read the table column by column against mine pre-beneficiation feed: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a brownfield extension in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivestrict product cubicity
Evaluation horizonthree-year view
Site conditiona brownfield extension
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for vsi vertical shaft impact crusher (sand making machine) may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  2. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  3. Sequence delivery so foundations cure while the equipment is still in manufacture.
  4. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  5. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  6. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  7. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  8. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  9. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.

A realistic programme reserves time for permits, foundation curing and shipping to Canada before any steel is cut.

From enquiry to the first saleable tonne — HAMAC impact crusher reference
From enquiry to the first saleable tonne — HAMAC impact crusher reference.

What to verify before you sign

  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Control system language, telemetry and remote diagnostics availability.

The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Buying strict product cubicity on price alone and losing it in availability.
  • Overlooking dust, noise and water permits in Canada until erection has already started.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.

On a brownfield extension, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Check belt tracking, chute build-up and transfer-point dust.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Record the baseline grading curve for each product fraction.
  4. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  5. Test emergency stops, pull wires and interlock trips in sequence.
  6. Sample each product fraction and compare with the specification.
  7. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  8. Confirm the direction and tension of every belt under no load.

On a brownfield extension, allow extra time for the dust and noise measurements.

VSI Vertical Shaft Impact Crusher (Sand Making Machine) in Canada: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the VSI Vertical Shaft Impact Crusher (Sand Making Machine) be built for 575V 60Hz?

Yes — motors, starters and control panels are specified for 575V 60Hz before manufacture.

Where does HAMAC ship in Canada?

Standard delivery is quoted to Vancouver; an alternative port can be agreed in the contract.

Do you build plants for mine pre-beneficiation feed?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

What documents are needed for Canada?

Packing list, commercial invoice, bill of lading, certificate of origin and the CSA documentation applicable to the machine.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call