Gold ore (Mohs 4, ~110 MPa) is processed in Ecuador for aggregates, ore or industrial minerals. HAMAC configures the circuit to local conditions: Guayaquil, 380V 60Hz, NEC.

Gold ore properties
| Property | Value |
|---|---|
| Mohs | 4 |
| Compressive strength | 110 MPa |
| Abrasion | Medium |
| Circuit | jaw + cone + ball mill |
In Ecuador
- Port: Guayaquil.
- Power: 380V 60Hz.
- Standards: NEC.
Equipment
- PE Series Jaw Crusher
- HPT Multi-Cylinder Hydraulic Cone Crusher
Budget
Send material, capacity and product sizes for a configured FOB/CIF budget to Guayaquil.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Gold ore |
| Mohs hardness | 4 |
| Compressive strength | ~110 MPa |
| Abrasiveness | Medium |
| Recommended circuit | jaw + cone + ball mill |
| Destination port | Guayaquil |
| Site supply | 380V 60Hz |
| Local standards | NEC |
| Region | South America |
| Assumed duty | contract crushing on short-term sites |
| Evaluation horizon | three-year view |
At contract crushing on short-term sites, the ranking of these parameters changes: fast mobilisation usually becomes the deciding constraint rather than the headline tonnage.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | contract crushing on short-term sites |
| Primary objective | fast mobilisation |
| Evaluation horizon | three-year view |
| Site condition | a greenfield site |
| Operating team | a mixed local and expatriate team |
Change any one of these assumptions and the recommended configuration for gold ore crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
- Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
- Survey the feed: Gold ore (Mohs 4, ~110 MPa, medium abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
- Apply jaw + cone + ball mill; the reduction mechanism must suit medium abrasion and a compressive strength near 110 MPa.
- Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
- Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

What to verify before you sign
- Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
- After-sales response time, technician availability and the warranty exclusions in writing.
- Guaranteed power draw and the fast mobilisation trade-off it implies.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Product sampling points and the lab equipment needed for routine grading checks.
- Choke-feed arrangement: surge bin, feeder control and level indication.
- Liner alloy: Mn13 is a common starting point for gold ore at medium abrasion.
- Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
- Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
Ask each supplier to price the same list. Quotations for gold ore crushing only become comparable when the scope is identical.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 51% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 16% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
On contract crushing on short-term sites, the fast mobilisation objective changes which line deserves the most attention during value engineering.
Mistakes that cost more than the machine
- Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
- Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
- Ordering no spares with the plant and waiting six weeks for the first liner set.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
- Specifying motors for the wrong voltage or frequency and rewinding them on site.
- Assuming the manufacturer's warranty covers wear parts and consumables.
- Overlooking dust, noise and water permits in Ecuador until erection has already started.
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
For contract crushing on short-term sites, protect the fast mobilisation requirement explicitly in the contract documents.
Commissioning checklist
- Verify rotation direction on every motor before coupling.
- Confirm all guards, emergency stops and pull-wire switches function.
- Check belt tracking, chute build-up and transfer-point dust.
- Check lubrication levels, grease lines and oil cooler operation.
- Measure noise and dust at the operator position against the local limit.
- Confirm the direction and tension of every belt under no load.
- Record power draw, tonnage and chamber pressure at steady state.
- Dry-run the plant empty for the specified period and record vibration.
On a greenfield site, allow extra time for the dust and noise measurements.