● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

500–800 TPH Crushing Plant in Turkey

500–800 TPH crushing plant supplied to Turkey via Istanbul at 380V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 500–800 tph crushing plant is a common size for Turkey. Main machines: dual primary + multi-cone. Large quarry / mine feed.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • dual primary + multi-cone
  • Shipped to Istanbul.
  • Configured to 380V 50Hz / TS EN.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Turkey

  • Port: Istanbul.
  • Voltage: 380V 50Hz.
  • Standards: TS EN.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity500–800 t/h
Typical main linedual primary + multi-cone
Scale noteLarge quarry / mine feed.
Destination portIstanbul
Site supply380V 50Hz
Local standardsTS EN
RegionEurope/Asia
Assumed dutymanufactured-sand production
Evaluation horizonten-year view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectiveminimal civil works
Evaluation horizonten-year view
Site conditionan existing quarry bench
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  2. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  3. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  4. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  5. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  6. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  7. Confirm the haul-road and stockpile plan with an existing quarry bench in mind before fixing conveyor lengths.
  8. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  9. Size the primary stage for 500–800 t/h with a 10–20% surge allowance — never on nameplate throughput alone.

On manufactured-sand production, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Nameplate data for 380V 50Hz and the TS EN certificate set.
  • Guaranteed power draw and the minimal civil works trade-off it implies.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Liner alloy: Mn18 matched to the rock, not to the lowest purchase price.
  • Decommissioning or relocation value at the end of a ten-year horizon.

Share this list with a rotating shift crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

On manufactured-sand production, the minimal civil works objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Check lubrication levels, grease lines and oil cooler operation.
  2. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  3. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  4. Test emergency stops, pull wires and interlock trips in sequence.
  5. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  6. Calibrate the belt scale and any level probes against a known load.
  7. Check belt tracking, chute build-up and transfer-point dust.
  8. Confirm the direction and tension of every belt under no load.

The commissioning record becomes the reference for every liner change in the ten-year plan.

500–800 TPH Crushing Plant in Turkey — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 500–800 TPH plant to Turkey?

Yes — to Istanbul with TS EN documentation.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call