Design basis for YGM High Pressure Grinding Mill grinding petroleum coke
The design basis starts with the powder, not the mill. Petroleum coke is a medium mineral at Mohs 1–2 (brittle) with low moisture sensitivity and specific gravity about 2.0. For a slag grinding for cement the saleable target is fuel-grade petcoke powder at D97 75–150 µm. Hard and brittle with volatile content; drying and dust extraction are critical. Operator notes from the first month are often the best diagnostic data.
A YGM High Pressure Grinding Mill is a sensible starting point for this duty: 1–30 t/h capacity, 80–425 mesh (D97 30–180 µm) fineness range, hard minerals up to Mohs 9.3 where higher pressure improves throughput. For this combination HAMAC works from an indicative design point of 10 t/h of saleable powder, with a maximum feed size near 25 mm and a target D97 of 75–150. Fineness is a distribution, not a single mesh number.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Petroleum coke · Mohs 1–2 (brittle) · medium · SG 2.0 |
| Design throughput | 10 t/h saleable powder (10–60 t/h scenario band) |
| Target fineness | D97 75–150 µm |
| Maximum feed size | ~25 mm |
| Mill type | YGM High Pressure Grinding Mill |
| Suggested line | crusher → dryer → grinding mill |

Why bag filter pressure drop appears in this grinding circuit
Differential pressure across the dust collector rises and the mill loses air flow. In a YGM High Pressure Grinding Mill circuit on petroleum coke this is usually a system symptom across the mill, classifier and collector rather than a single machine fault. Two plants with the same nominal t/h can have very different operating costs.
- bags are blinded by fine or damp powder
- the cleaning pulse interval or pressure is wrong
- duct leakage reduces the effective extraction volume
A change in one stage changes the circulating load in all the others. Before changing a mill setting, check these in order: 1) trend differential pressure every shift; 2) measure air volume at the mill outlet and collector; 3) inspect pulse valves and compressed-air dryness. HAMAC states nominal values alongside the conditions they were measured under.
Recommended grinding configuration
For petroleum coke at 10 t/h the working line is crusher → dryer → grinding mill. The YGM High Pressure Grinding Mill sits at the centre; a dynamic air classifier sets the cut and a pulse-jet bag filter holds the system under negative pressure so the finished powder stays clean. Operator notes from the first month are often the best diagnostic data.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Weigh / belt feeder, VFD control, ~12 t/h design margin |
| Milling | YGM High Pressure Grinding Mill, 1–30 t/h, 80–425 mesh (D97 30–180 µm) |
| Classification | Dynamic air classifier, rotor speed tuned to target D97 75–150 |
| Collection | Pulse-jet bag filter, negative pressure, ~12 m³/min air volume |
| Conveying / air | Centrifugal fan and ducting sized for 12 m³/min total air |
| Control | Interlocked start-up, load-based feed trim, ~140 kW connected load |
The corrective actions for bag filter pressure drop are applied on top of this base circuit: set the pulse cycle from measured differential pressure; replace blinded bags and check hopper discharge; seal the ducting and verify air volume at the mill outlet.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after any liner, rotor or media change. For this circuit the starting point is a classifier rotor speed that holds D97 75–150, a circulating load around 65% and a collection efficiency above 99%. A change in one stage changes the circulating load in all the others.
- Trend differential pressure every shift
- Measure air volume at the mill outlet and collector
- Inspect pulse valves and compressed-air dryness
| Parameter | Indicative value / method |
|---|---|
| Fineness | Laser diffraction / sieve, target D97 75–150, agreed standard |
| Capacity | Weighed saleable powder per shift, 10 t/h nominal |
| Moisture | Feed and product moisture each shift |
| Power | Main drive current at steady feed, ~140 kW connected load |
| Purity | Brightness / Fe content batch check for white fillers |
HAMAC states nominal values alongside the conditions they were measured under. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, mill setting and classifier efficiency.
Cost, risk and what to confirm in writing
Compare this grinding plant as cost per tonne of saleable powder, not purchase price. Energy, wear parts, media and downtime dominate the operating cost for petroleum coke, while energy per tonne determines how much lost production actually costs. Two plants with the same nominal t/h can have very different operating costs.
- Ask every supplier for the same flow sheet and mass balance, including the 65% return / circulating load.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 10 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the fineness test method (laser diffraction vs. sieve), sampling point and acceptance test before the order is placed.
Operator notes from the first month are often the best diagnostic data. HAMAC states nominal values alongside the conditions they were measured under. Send your material, feed size, target fineness and capacity to HAMAC Machinery for a comparable configuration and budget.