Design basis for LM Vertical Slag Mill grinding bentonite
The design basis starts with the powder, not the mill. Bentonite is a very soft mineral at Mohs 1–2 with high moisture sensitivity and specific gravity about 2.3. For a industrial filler production the saleable target is binder and drilling-mud powder at D97 45–150 µm. High moisture and swelling make drying and pellet control decisive. Record the setting before adjusting it, or the baseline is lost.
A LM Vertical Slag Mill is a sensible starting point for this duty: 8–60 t/h capacity, 20–80 µm (D97, Blaine 4200+ cm²/g) fineness range, ground granulated blast-furnace slag for cement blending. For this combination HAMAC works from an indicative design point of 5 t/h of saleable powder, with a maximum feed size near 35 mm and a target D97 of 45–150. Fineness is a distribution, not a single mesh number.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Bentonite · Mohs 1–2 · very soft · SG 2.3 |
| Design throughput | 5 t/h saleable powder (3–25 t/h scenario band) |
| Target fineness | D97 45–150 µm |
| Maximum feed size | ~35 mm |
| Mill type | LM Vertical Slag Mill |
| Suggested line | crusher → dryer → grinding mill → classifier |

Why powder moisture and caking appears in this grinding circuit
Powder cakes in the silo and the finished product moisture drifts upward. In a LM Vertical Slag Mill circuit on bentonite this is usually a system symptom across the mill, classifier and collector rather than a single machine fault. A supplier can only guarantee a figure when the test conditions are written down.
- feed surface moisture rises after rain or washing
- hot-air volume is insufficient for the evaporation load
- duct condensation forms at cold starts
The reference conditions should be attached to every figure quoted. Before changing a mill setting, check these in order: 1) measure feed and product moisture each shift; 2) log mill outlet temperature; 3) inspect ducting and the bag hopper for condensation. Agree the acceptance test and sampling method before the order is placed.
Recommended grinding configuration
For bentonite at 5 t/h the working line is crusher → dryer → grinding mill → classifier. The LM Vertical Slag Mill sits at the centre; a dynamic air classifier sets the cut and a pulse-jet bag filter holds the system under negative pressure so the finished powder stays clean. Record the setting before adjusting it, or the baseline is lost.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Weigh / belt feeder, VFD control, ~6 t/h design margin |
| Milling | LM Vertical Slag Mill, 8–60 t/h, 20–80 µm (D97, Blaine 4200+ cm²/g) |
| Classification | Dynamic air classifier, rotor speed tuned to target D97 45–150 |
| Collection | Pulse-jet bag filter, negative pressure, ~9 m³/min air volume |
| Conveying / air | Centrifugal fan and ducting sized for 9 m³/min total air |
| Control | Interlocked start-up, load-based feed trim, ~50 kW connected load |
The corrective actions for powder moisture and caking are applied on top of this base circuit: add or uprate the drying stage and meter inlet moisture; balance hot-air volume with feed rate and outlet temperature; pre-heat the circuit and insulate cold duct sections.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after any liner, rotor or media change. For this circuit the starting point is a classifier rotor speed that holds D97 45–150, a circulating load around 65% and a collection efficiency above 99%. The reference conditions should be attached to every figure quoted.
- Measure feed and product moisture each shift
- Log mill outlet temperature
- Inspect ducting and the bag hopper for condensation
| Parameter | Indicative value / method |
|---|---|
| Fineness | Laser diffraction / sieve, target D97 45–150, agreed standard |
| Capacity | Weighed saleable powder per shift, 5 t/h nominal |
| Moisture | Feed and product moisture each shift |
| Power | Main drive current at steady feed, ~50 kW connected load |
| Purity | Brightness / Fe content batch check for white fillers |
Agree the acceptance test and sampling method before the order is placed. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, mill setting and classifier efficiency.
Cost, risk and what to confirm in writing
Compare this grinding plant as cost per tonne of saleable powder, not purchase price. Energy, wear parts, media and downtime dominate the operating cost for bentonite, while product purity determines how much lost production actually costs. A supplier can only guarantee a figure when the test conditions are written down.
- Ask every supplier for the same flow sheet and mass balance, including the 65% return / circulating load.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 5 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the fineness test method (laser diffraction vs. sieve), sampling point and acceptance test before the order is placed.
Record the setting before adjusting it, or the baseline is lost. Agree the acceptance test and sampling method before the order is placed. Send your material, feed size, target fineness and capacity to HAMAC Machinery for a comparable configuration and budget.