Design basis for TGM Trapezium Mill grinding fly ash
The design basis starts with the powder, not the mill. Fly ash is a very fine mineral at Mohs glass with low moisture sensitivity and specific gravity about 2.1. For a slag grinding for cement the saleable target is classified ash for cement / filler at D97 10–60 µm. Already fine; the task is classification and de-agglomeration rather than size reduction. Operator notes from the first month are often the best diagnostic data.
A TGM Trapezium Mill is a sensible starting point for this duty: 2–40 t/h capacity, 40–200 µm fineness range, mid-size powder production for fillers and additives. For this combination HAMAC works from an indicative design point of 10 t/h of saleable powder, with a maximum feed size near 15 mm and a target D97 of 10–60. Fineness is a distribution, not a single mesh number.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Fly ash · Mohs glass · very fine · SG 2.1 |
| Design throughput | 10 t/h saleable powder (10–60 t/h scenario band) |
| Target fineness | D97 10–60 µm |
| Maximum feed size | ~15 mm |
| Mill type | TGM Trapezium Mill |
| Suggested line | pneumatic feed → air classifier → collecting filter |

Why powder moisture and caking appears in this grinding circuit
Powder cakes in the silo and the finished product moisture drifts upward. In a TGM Trapezium Mill circuit on fly ash this is usually a system symptom across the mill, classifier and collector rather than a single machine fault. The cheapest fix is usually a settings change; the most expensive is a new machine.
- feed surface moisture rises after rain or washing
- hot-air volume is insufficient for the evaporation load
- duct condensation forms at cold starts
A change in one stage changes the circulating load in all the others. Before changing a mill setting, check these in order: 1) measure feed and product moisture each shift; 2) log mill outlet temperature; 3) inspect ducting and the bag hopper for condensation. Agree the acceptance test and sampling method before the order is placed.
Recommended grinding configuration
For fly ash at 10 t/h the working line is pneumatic feed → air classifier → collecting filter. The TGM Trapezium Mill sits at the centre; a dynamic air classifier sets the cut and a pulse-jet bag filter holds the system under negative pressure so the finished powder stays clean. Operator notes from the first month are often the best diagnostic data.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Weigh / belt feeder, VFD control, ~12 t/h design margin |
| Milling | TGM Trapezium Mill, 2–40 t/h, 40–200 µm |
| Classification | Dynamic air classifier, rotor speed tuned to target D97 10–60 |
| Collection | Pulse-jet bag filter, negative pressure, ~15 m³/min air volume |
| Conveying / air | Centrifugal fan and ducting sized for 15 m³/min total air |
| Control | Interlocked start-up, load-based feed trim, ~140 kW connected load |
The corrective actions for powder moisture and caking are applied on top of this base circuit: add or uprate the drying stage and meter inlet moisture; balance hot-air volume with feed rate and outlet temperature; pre-heat the circuit and insulate cold duct sections.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after any liner, rotor or media change. For this circuit the starting point is a classifier rotor speed that holds D97 10–60, a circulating load around 45% and a collection efficiency above 99%. A change in one stage changes the circulating load in all the others.
- Measure feed and product moisture each shift
- Log mill outlet temperature
- Inspect ducting and the bag hopper for condensation
| Parameter | Indicative value / method |
|---|---|
| Fineness | Laser diffraction / sieve, target D97 10–60, agreed standard |
| Capacity | Weighed saleable powder per shift, 10 t/h nominal |
| Moisture | Feed and product moisture each shift |
| Power | Main drive current at steady feed, ~140 kW connected load |
| Purity | Brightness / Fe content batch check for white fillers |
Agree the acceptance test and sampling method before the order is placed. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, mill setting and classifier efficiency.
Cost, risk and what to confirm in writing
Compare this grinding plant as cost per tonne of saleable powder, not purchase price. Energy, wear parts, media and downtime dominate the operating cost for fly ash, while energy per tonne determines how much lost production actually costs. The cheapest fix is usually a settings change; the most expensive is a new machine.
- Ask every supplier for the same flow sheet and mass balance, including the 45% return / circulating load.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 10 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the fineness test method (laser diffraction vs. sieve), sampling point and acceptance test before the order is placed.
Operator notes from the first month are often the best diagnostic data. Agree the acceptance test and sampling method before the order is placed. Send your material, feed size, target fineness and capacity to HAMAC Machinery for a comparable configuration and budget.