Design basis for Sand Powder Vertical Mill grinding bentonite
The design basis starts with the powder, not the mill. Bentonite is a very soft mineral at Mohs 1–2 with high moisture sensitivity and specific gravity about 2.3. For a slag grinding for cement the saleable target is binder and drilling-mud powder at D97 45–150 µm. High moisture and swelling make drying and pellet control decisive. A change in one stage changes the circulating load in all the others.
A Sand Powder Vertical Mill is a sensible starting point for this duty: 5–45 t/h capacity, 40–200 µm fineness range, combined sand and powder production from one vertical unit. For this combination HAMAC works from an indicative design point of 10 t/h of saleable powder, with a maximum feed size near 25 mm and a target D97 of 45–150. Fineness is a distribution, not a single mesh number.
| Parameter | Indicative value / method |
|---|---|
| Raw material | Bentonite · Mohs 1–2 · very soft · SG 2.3 |
| Design throughput | 10 t/h saleable powder (10–60 t/h scenario band) |
| Target fineness | D97 45–150 µm |
| Maximum feed size | ~25 mm |
| Mill type | Sand Powder Vertical Mill |
| Suggested line | crusher → dryer → grinding mill → classifier |

Why unstable powder fineness appears in this grinding circuit
D97 drifts even though the mill settings have not changed. In a Sand Powder Vertical Mill circuit on bentonite this is usually a system symptom across the mill, classifier and collector rather than a single machine fault. Start from the product specification and work backwards to the feed.
- classifier rotor speed and system air flow are tuned independently
- duct leakage changes the real air volume
- feed moisture or top size varies between batches
Indicative values are starting points for a design, not guarantees. Before changing a mill setting, check these in order: 1) sample D50 and D97 every hour for a full shift; 2) measure airflow at the mill outlet; 3) check bag-filter differential pressure. Agree the acceptance test and sampling method before the order is placed.
Recommended grinding configuration
For bentonite at 10 t/h the working line is crusher → dryer → grinding mill → classifier. The Sand Powder Vertical Mill sits at the centre; a dynamic air classifier sets the cut and a pulse-jet bag filter holds the system under negative pressure so the finished powder stays clean. A change in one stage changes the circulating load in all the others.
| Parameter | Indicative value / method |
|---|---|
| Feeding | Weigh / belt feeder, VFD control, ~12 t/h design margin |
| Milling | Sand Powder Vertical Mill, 5–45 t/h, 40–200 µm |
| Classification | Dynamic air classifier, rotor speed tuned to target D97 45–150 |
| Collection | Pulse-jet bag filter, negative pressure, ~12 m³/min air volume |
| Conveying / air | Centrifugal fan and ducting sized for 12 m³/min total air |
| Control | Interlocked start-up, load-based feed trim, ~100 kW connected load |
The corrective actions for unstable powder fineness are applied on top of this base circuit: tune classifier speed and fan damper as one control loop; seal the ducting and verify air volume at the collector; stabilise feed size and moisture before the mill inlet.

Operating settings and acceptance checks
Settings must be recorded at commissioning and re-checked after any liner, rotor or media change. For this circuit the starting point is a classifier rotor speed that holds D97 45–150, a circulating load around 35% and a collection efficiency above 99%. Indicative values are starting points for a design, not guarantees.
- Sample D50 and D97 every hour for a full shift
- Measure airflow at the mill outlet
- Check bag-filter differential pressure
| Parameter | Indicative value / method |
|---|---|
| Fineness | Laser diffraction / sieve, target D97 45–150, agreed standard |
| Capacity | Weighed saleable powder per shift, 10 t/h nominal |
| Moisture | Feed and product moisture each shift |
| Power | Main drive current at steady feed, ~100 kW connected load |
| Purity | Brightness / Fe content batch check for white fillers |
Agree the acceptance test and sampling method before the order is placed. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, mill setting and classifier efficiency.
Cost, risk and what to confirm in writing
Compare this grinding plant as cost per tonne of saleable powder, not purchase price. Energy, wear parts, media and downtime dominate the operating cost for bentonite, while energy per tonne determines how much lost production actually costs. Start from the product specification and work backwards to the feed.
- Ask every supplier for the same flow sheet and mass balance, including the 35% return / circulating load.
- State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
- Model annual output as 10 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
- Agree the fineness test method (laser diffraction vs. sieve), sampling point and acceptance test before the order is placed.
A change in one stage changes the circulating load in all the others. Agree the acceptance test and sampling method before the order is placed. Send your material, feed size, target fineness and capacity to HAMAC Machinery for a comparable configuration and budget.