Project summary
250tph stationary aggregate crushing and screening plant in South Sudan is a HAMAC reference project in South Sudan, commissioned in 2011. The line is rated at 250tph and processes basalt. This 250tph stationary aggregate crushing and screening plant as delivered to South Sudan in 2011. It is a project which was invested by our clients from Lebanon. It includes one vibrating feeder, one jaw crusher PE900*1200, and two units secondary crusher, SYMONS cone crusher, and two units of vibrating screen.
This 250tph stationary aggregate crushing and screening plant as delivered to South Sudan in 2011. It is a project which was invested by our clients from Lebanon. It includes one vibrating feeder, one jaw crusher PE900*1200, and two units secondary crusher, SYMONS cone crusher, and two units of vibrating screen.
| Parameter | Value |
|---|---|
| Raw Material | basalt |
| Maximum Feeding Size | 756mm |
| Vibrating Feeder | ZSW1300*4900 |
| Jaw Crusher | PE900*1200; feeding opening 900*1200mm |
| Secondary Crusher | Cone crusher 4.25ft, two units, one coarse cavity |
| Nominal Capacity | 250-300t/h |

Equipment configuration and process
The published configuration for this project is listed above, with PE900*1200; feeding opening 900*1200mm as a key machine. In HAMAC projects, the equipment list is fixed only after the raw material, feed gradation and saleable product fractions are confirmed — the same nominal capacity can require different crushers for basalt, limestone or river pebble.
A typical line of this size runs: vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Dust suppression, washing and a magnetic separator are added where the feed or product specification requires them.
Compare similar plants in the project library or browse plant designs by capacity.
Delivery, installation and support
HAMAC's stated service scope covers initial consultation, solution design, site visit, production, shipment, installation supervision, commissioning, operator training, spare-parts supply and after-sales handling. For export projects the commercial scope is normally agreed as FOB, CFR or CIF, with local civil work and lifting equipment defined in the contract.
- Factory assembly and test before shipment
- Container / break-bulk loading plan with shipped spare parts and tools
- Installation drawings and commissioning supervision
- Operator training and recommended wear-parts stock list