ملخص التكوين
300 TPH gypsum mobile crushing plant in Nigeria is an indicative HAMAC Machinery engineering reference configuration for Nigeria, not a record of a delivered plant. It sizes a 300 TPH line for gypsum from published equipment data; no customer name, contract value or commissioning date is claimed. Engineering reference for a 300-350 t/h gypsum mobile crushing plant in Nigeria, sized for board and cement plant feed. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
Engineering reference for a 300-350 t/h gypsum mobile crushing plant in Nigeria, sized for board and cement plant feed. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
| المعلمة | القيمة |
|---|---|
| المادة الخام | الجبس |
| الطاقة الاسمية | 300-350 طن/ساعة |
| أقصى حجم للتغذية | 900 mm |
| حجم الناتج | 0-5، 5-16، 16-31.5، 31.5-63 مم |
| الكسارة الأولية | PE1200×1500 كسارة الفك |
| الكسارة الثانوية | HPT500 الكسارة المخروطية |
| الغربال الهزاز | 3YK3075، 3 مجموعات |
| الدائرة | الفك + الصدمة في الدائرة المغلقة |
| التطبيق | الألواح ومواد التغذية لمصانع الأسمنت |
| الطاقة والتصميم | تم التأكيد بعد مراجعة الموقع |

تكوين المعدات والعملية
يرد أعلاه التكوين الإرشادي لهذه الدراسة. في مشاريع HAMAC، لا يتم تحديد قائمة المعدات إلا بعد التأكد من المواد الخام وتصنيف المواد الأولية وأجزاء المنتج القابلة للبيع — فقد تتطلب السعة الاسمية نفسها استخدام كسارات مختلفة للبازلت أو الحجر الجيري أو حصى الأنهار.
يتكون الخط النموذجي من هذا الحجم من: مغذي اهتزازي → كسارة فكّية أولية → كسارة مخروطية أو صدمية ثانوية → غربال اهتزازي متعدد الطبقات → ناقلات حزامية، مع إعادة المواد ذات الحجم الزائد إلى الدائرة المغلقة. ويتم إضافة أنظمة كبح الغبار والغسل والفاصل المغناطيسي عندما تتطلب مواصفات المواد الواردة أو المنتج ذلك.
For a 300 TPH gypsum line in Nigeria, three inputs usually decide the final bill of materials: feed moisture above 5 % usually decides whether dry screening is viable at all, and it changes the deck area required to hold the target throughput; operator training and a recorded baseline of power draw, vibration and product gradation at hand-over make later troubleshooting measurable; spare-part lead time for liners, blow bars and screen meshes should be agreed with the maintenance plan, not after the first wear cycle. These are the points a HAMAC engineer checks against your own test data before the equipment list is fixed; the table above is therefore a starting specification rather than a quotation.
Compare similar plants in the project library or browse plant designs by capacity.
التسليم والتركيب والدعم
يشمل نطاق الخدمة المعلن عن HAMAC الاستشارة الأولية، وتصميم الحلول، وزيارة الموقع، والإنتاج، والشحن، والإشراف على التركيب، والتشغيل التجريبي، وتدريب المشغلين، وتوريد قطع الغيار، وخدمات ما بعد البيع. وبالنسبة لمشاريع التصدير، يتم الاتفاق عادةً على النطاق التجاري وفقًا لشروط FOB أو CFR أو CIF، مع تحديد الأعمال المدنية ومعدات الرفع المحلية في العقد.
- التجميع والاختبار في المصنع قبل الشحن
- خطة التحميل في حاويات / شحن جزئي مع قطع الغيار والأدوات المرسلة
- رسومات التركيب والإشراف على التشغيل التجريبي
- تدريب المشغلين وقائمة قطع التآكل الموصى بتخزينها