ملخص التكوين
400 TPH manganese ore stationary crushing plant in United Arab Emirates is an indicative HAMAC Machinery engineering reference configuration for United Arab Emirates, not a record of a delivered plant. It sizes a 400 TPH line for manganese ore from published equipment data; no customer name, contract value or commissioning date is claimed. Engineering reference for a 400-500 t/h manganese ore stationary crushing plant in United Arab Emirates, sized for ore sizing for beneficiation. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
Engineering reference for a 400-500 t/h manganese ore stationary crushing plant in United Arab Emirates, sized for ore sizing for beneficiation. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
| المعلمة | القيمة |
|---|---|
| المادة الخام | خام المنغنيز |
| الطاقة الاسمية | 400-500 طن/ساعة |
| أقصى حجم للتغذية | 1,000 mm |
| حجم الناتج | 0-5، 5-20، 20-40، 40-80 مم |
| الكسارة الأولية | PE1500×1800 كسارة الفك |
| الكسارة الثانوية | HPT800 كسارة مخروطية × 2 |
| الغربال الهزاز | 4YK3075، 4 مجموعات |
| الدائرة | الفك + المخروط في دائرة مغلقة |
| التطبيق | تصنيف الخام حسب الحجم لأغراض التخصيب |
| الطاقة والتصميم | تم التأكيد بعد مراجعة الموقع |

تكوين المعدات والعملية
يرد أعلاه التكوين الإرشادي لهذه الدراسة. في مشاريع HAMAC، لا يتم تحديد قائمة المعدات إلا بعد التأكد من المواد الخام وتصنيف المواد الأولية وأجزاء المنتج القابلة للبيع — فقد تتطلب السعة الاسمية نفسها استخدام كسارات مختلفة للبازلت أو الحجر الجيري أو حصى الأنهار.
يتكون الخط النموذجي من هذا الحجم من: مغذي اهتزازي → كسارة فكّية أولية → كسارة مخروطية أو صدمية ثانوية → غربال اهتزازي متعدد الطبقات → ناقلات حزامية، مع إعادة المواد ذات الحجم الزائد إلى الدائرة المغلقة. ويتم إضافة أنظمة كبح الغبار والغسل والفاصل المغناطيسي عندما تتطلب مواصفات المواد الواردة أو المنتج ذلك.
For a 400 TPH manganese ore line in United Arab Emirates, three inputs usually decide the final bill of materials: the ratio of saleable fractions in the local market matters more than nameplate t/h, because recirculating load grows when the required chip size is small; grid voltage and frequency, plus the available starting current for the largest motor, must be fixed before the electrical schedule is released; feed moisture above 5 % usually decides whether dry screening is viable at all, and it changes the deck area required to hold the target throughput. These are the points a HAMAC engineer checks against your own test data before the equipment list is fixed; the table above is therefore a starting specification rather than a quotation.
Compare similar plants in the project library or browse plant designs by capacity.
التسليم والتركيب والدعم
يشمل نطاق الخدمة المعلن عن HAMAC الاستشارة الأولية، وتصميم الحلول، وزيارة الموقع، والإنتاج، والشحن، والإشراف على التركيب، والتشغيل التجريبي، وتدريب المشغلين، وتوريد قطع الغيار، وخدمات ما بعد البيع. وبالنسبة لمشاريع التصدير، يتم الاتفاق عادةً على النطاق التجاري وفقًا لشروط FOB أو CFR أو CIF، مع تحديد الأعمال المدنية ومعدات الرفع المحلية في العقد.
- التجميع والاختبار في المصنع قبل الشحن
- خطة التحميل في حاويات / شحن جزئي مع قطع الغيار والأدوات المرسلة
- رسومات التركيب والإشراف على التشغيل التجريبي
- تدريب المشغلين وقائمة قطع التآكل الموصى بتخزينها