200 TPH coal stationary crushing plant in Malaysia is an indicative HAMAC Machinery engineering reference configuration for Malaysia, not a record of a delivered plant. It sizes a 200 TPH line for coal from published equipment data; no customer name, contract value or commissioning date is claimed. Engineering reference for a 200-250 t/h coal stationary crushing plant in Malaysia, sized for sizing for power and industrial fuel. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
Engineering reference for a 200-250 t/h coal stationary crushing plant in Malaysia, sized for sizing for power and industrial fuel. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
| المعلمة | القيمة |
|---|---|
| المادة الخام | الفحم |
| الطاقة الاسمية | 200-250 طن/ساعة |
| أقصى حجم للتغذية | 800 mm |
| حجم الناتج | 0-5، 5-10، 10-20، 20-40 مم |
| الكسارة الأولية | PE1000×1200 كسارة الفك |
| الكسارة الثانوية | HPT300 الكسارة المخروطية |
| الغربال الهزاز | 4YK2460، 4 مجموعات أوراق اللعب |
| الدائرة | الفك + الصدمة في الدائرة المغلقة |
| التطبيق | تحديد الأحجام لأغراض الطاقة والوقود الصناعي |
| الطاقة والتصميم | تم التأكيد بعد مراجعة الموقع |

تكوين المعدات والعملية
يرد أعلاه التكوين الإرشادي لهذه الدراسة. في مشاريع HAMAC، لا يتم تحديد قائمة المعدات إلا بعد التأكد من المواد الخام وتصنيف المواد الأولية وأجزاء المنتج القابلة للبيع — فقد تتطلب السعة الاسمية نفسها استخدام كسارات مختلفة للبازلت أو الحجر الجيري أو حصى الأنهار.
يتكون الخط النموذجي من هذا الحجم من: مغذي اهتزازي → كسارة فكّية أولية → كسارة مخروطية أو صدمية ثانوية → غربال اهتزازي متعدد الطبقات → ناقلات حزامية، مع إعادة المواد ذات الحجم الزائد إلى الدائرة المغلقة. ويتم إضافة أنظمة كبح الغبار والغسل والفاصل المغناطيسي عندما تتطلب مواصفات المواد الواردة أو المنتج ذلك.
For a 200 TPH coal line in Malaysia, three inputs usually decide the final bill of materials: grid voltage and frequency, plus the available starting current for the largest motor, must be fixed before the electrical schedule is released; the compressive strength and silica content of the rock set the choice between a compression circuit and an impact stage, and dominate liner consumption; when the plant feeds a concrete or asphalt batching plant, stockpile segregation and the number of separate product bins become part of the layout. These are the points a HAMAC engineer checks against your own test data before the equipment list is fixed; the table above is therefore a starting specification rather than a quotation.
Compare similar plants in the project library or browse plant designs by capacity.
التسليم والتركيب والدعم
يشمل نطاق الخدمة المعلن عن HAMAC الاستشارة الأولية، وتصميم الحلول، وزيارة الموقع، والإنتاج، والشحن، والإشراف على التركيب، والتشغيل التجريبي، وتدريب المشغلين، وتوريد قطع الغيار، وخدمات ما بعد البيع. وبالنسبة لمشاريع التصدير، يتم الاتفاق عادةً على النطاق التجاري وفقًا لشروط FOB أو CFR أو CIF، مع تحديد الأعمال المدنية ومعدات الرفع المحلية في العقد.
- التجميع والاختبار في المصنع قبل الشحن
- خطة التحميل في حاويات / شحن جزئي مع قطع الغيار والأدوات المرسلة
- رسومات التركيب والإشراف على التشغيل التجريبي
- تدريب المشغلين وقائمة قطع التآكل الموصى بتخزينها