ملخص التكوين
100 TPH basalt aggregate crushing and screening plant in Qatar is an indicative HAMAC Machinery engineering reference configuration for Qatar, not a record of a delivered plant. It sizes a 100 TPH line for basalt from published equipment data; no customer name, contract value or commissioning date is claimed. Engineering reference for a 100-120 t/h basalt aggregate crushing and screening plant in Qatar, sized for railway ballast and asphalt aggregate. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
Engineering reference for a 100-120 t/h basalt aggregate crushing and screening plant in Qatar, sized for railway ballast and asphalt aggregate. The configuration below is an indicative HAMAC circuit for this material and throughput; final equipment selection follows a material test, feed gradation, saleable product fractions and site power review. Figures are nominal and should be confirmed in a written proposal.
| المعلمة | القيمة |
|---|---|
| المادة الخام | البازلت |
| الطاقة الاسمية | 100-120 طن/ساعة |
| أقصى حجم للتغذية | 630 mm |
| حجم الناتج | 0-10، 10-20، 20-40 مم |
| الكسارة الأولية | PE750×1060 كسارة الفك |
| الكسارة الثانوية | PF1315 كسارة الصدم |
| الغربال الهزاز | YK2160، 3 مجموعات |
| الدائرة | الفك + المخروط في دائرة مغلقة |
| التطبيق | حشو السكك الحديدية وركام الإسفلت |
| الطاقة والتصميم | تم التأكيد بعد مراجعة الموقع |

تكوين المعدات والعملية
يرد أعلاه التكوين الإرشادي لهذه الدراسة. في مشاريع HAMAC، لا يتم تحديد قائمة المعدات إلا بعد التأكد من المواد الخام وتصنيف المواد الأولية وأجزاء المنتج القابلة للبيع — فقد تتطلب السعة الاسمية نفسها استخدام كسارات مختلفة للبازلت أو الحجر الجيري أو حصى الأنهار.
يتكون الخط النموذجي من هذا الحجم من: مغذي اهتزازي → كسارة فكّية أولية → كسارة مخروطية أو صدمية ثانوية → غربال اهتزازي متعدد الطبقات → ناقلات حزامية، مع إعادة المواد ذات الحجم الزائد إلى الدائرة المغلقة. ويتم إضافة أنظمة كبح الغبار والغسل والفاصل المغناطيسي عندما تتطلب مواصفات المواد الواردة أو المنتج ذلك.
For a 100 TPH basalt line in Qatar, three inputs usually decide the final bill of materials: dust-suppression water availability and the local discharge limit can add a bag filter or a washing stage that is not in a bare crusher list; ambient temperature and altitude derate diesel engines and affect lubrication selection on the crusher and screen bearings; the compressive strength and silica content of the rock set the choice between a compression circuit and an impact stage, and dominate liner consumption. These are the points a HAMAC engineer checks against your own test data before the equipment list is fixed; the table above is therefore a starting specification rather than a quotation.
Compare similar plants in the project library or browse plant designs by capacity.
التسليم والتركيب والدعم
يشمل نطاق الخدمة المعلن عن HAMAC الاستشارة الأولية، وتصميم الحلول، وزيارة الموقع، والإنتاج، والشحن، والإشراف على التركيب، والتشغيل التجريبي، وتدريب المشغلين، وتوريد قطع الغيار، وخدمات ما بعد البيع. وبالنسبة لمشاريع التصدير، يتم الاتفاق عادةً على النطاق التجاري وفقًا لشروط FOB أو CFR أو CIF، مع تحديد الأعمال المدنية ومعدات الرفع المحلية في العقد.
- التجميع والاختبار في المصنع قبل الشحن
- خطة التحميل في حاويات / شحن جزئي مع قطع الغيار والأدوات المرسلة
- رسومات التركيب والإشراف على التشغيل التجريبي
- تدريب المشغلين وقائمة قطع التآكل الموصى بتخزينها